Property Overhaul

A full property turnaround — mould treatment, replastering, new ceilings, window and door repairs, and complete redecoration throughout. Ready to let in 7 days.

Project at a glance

Client

R. Benson

Project value

£3,164

Duration

7 days

The brief

A property with serious mould issues across multiple rooms, damaged ceilings, worn-out plaster, and windows and doors in need of repair. The brief was simple: strip everything back, treat the mould, replaster, redecorate, and hand it over ready for the next tenant.

Mould treatment & ceilings

All affected areas were treated for mould using a clear mould spray to PVCu and GRP surfaces, followed by a GRP cleaner coat and a full glass-and-buff clean. Ceilings were stripped, dry-lined with 12.5mm thermalboard on treated softwood battens, and finished with a skim coat. Stain block was applied to all plastered surfaces before decoration.

Before
After

Walls & plastering

Old wallpaper was stripped throughout, and all walls were hacked back and replastered with a fresh 3mm skim coat. Damaged brickwork was raked out and repointed, and every surface was prepped and finished ready for decoration.

Before
After

Doors & wall repairs

Doors were overhauled, rehung, and adjusted throughout the property. Surrounding walls were stripped back, patched, and replastered where damaged. All frames were raked out and repointed with fresh silicone mastic sealant, and door stops were fitted across the flat.

Before
After

Decoration & finishing

Every room was redecorated with two coats of emulsion to ceilings and walls, plus an undercoat and gloss on all previously painted surfaces. Radiators were removed, serviced, and refixed. New softwood skirting was fitted throughout, and door stops were installed across the property.

Before
After

Need a property turned around quickly?

From mould treatment to full redecoration, we handle everything in-house and deliver on time. Get in touch for a free site visit.

Contact us
← Back to all projects
WhatsApp